Ask three foundries for a price per kilogram on EN-GJS-500-7 and you can get answers an order of magnitude apart, and every one of them can be honest. A 200 g plain bracket, a 40 kg pump body with two machined faces and a pressure test, and a 150 kg single-piece repair casting do not share a unit price, even though the melt chemistry is identical.
Per-kilogram pricing answers one question — what does the metal weigh — and ignores the five questions that decide the invoice. This page walks through the eight drivers, so a quote becomes something you can negotiate line by line instead of arguing with a total.
| Driver | What it moves | Typical effect |
|---|---|---|
| Melt and material index | Pig iron, scrap, ferroalloy prices | The floor under every quote |
| Casting weight band | Handling, line rate, yield | Small and very heavy parts cost more per kg |
| Wall and geometry complexity | Yield, scrap risk, cores | Each core adds labour and a defect risk |
| Batch size | Setup amortization | The first articles carry the setup alone |
| Machining share | CNC hours, fixtures | Heavy-machined parts: machining can exceed casting |
| Testing and certificates | Lab hours, NDT, paperwork | Pressure and NDT parts carry real inspection cost |
| Heat treatment | Furnace time | Adds a thermal step plus re-inspection |
| Tooling treatment | Amortized or invoiced separately | Affects piece price, not the casting itself |
Melt cost is the only driver with a public index, which is why per-kg figures feel comparable. Everything else is specific to the part. The practical consequence: two quotes on the same drawing can differ by 30 percent legitimately, if one includes machining stock sizing, test sampling and packaging and the other does not. Compare the scope lines, not the totals.
A 300 g casting on an automated line costs mostly handling and finish — the metal is trivial. A 5 tonne piece costs crane time, special moulds and slow cooling. Both quote higher per kilogram than the middle of the range, where a vertical line runs thousands of identical moulds a day. That is why our range runs from small components up to heavy parts, and why the weight band on your drawing changes the price class before any other factor.
Geometry inside the band matters too. A casting that is 30 percent riser and gate scrap charges that metal to you. A flat, symmetric part pours with high yield. The same nominal weight can differ 20 percent in real metal consumed, and a per-kg quote that ignores yield is quoting fiction.
Setup — pattern placement, first-off inspection, process sign-off — is a fixed cost spread over the batch. At 500 pieces the setup is a visible line; at 50,000 pieces it disappears into rounding. This is why minimum order quantities exist and why a low-volume quote looks uncompetitive against a mass-production price. Our MOQ starts at 500 pieces; below that, the honest framing is a small-batch price, not a discount argument.
The reverse trap exists too: a very low per-kg price on a huge volume may assume perfect production. If the part is new, ask for a pilot batch price and a ramp price separately. New parts scrap more in month one than month six, and a quote that pretends otherwise gets renegotiated in a bad mood later.
Rough casting a pump housing is the cheap half. Machining two faces, boring a seal bore to tolerance, and holding a gasket groove is the expensive half — CNC hours, fixtures, tool wear, and a second inspection. On heavily machined parts the machining can cost more than the casting. Any comparison between foundries that does not normalize the machining scope is comparing apples with fixtures.
The fix is boring and effective: mark the machined surfaces, give the tolerances, and let the quote show casting and machining as separate lines. Then both sides can see where the money went.
A certificate per heat with tensile and hardness is standard and cheap relative to its value. Pressure testing every casting, ultrasonic on heavy sections, magnetic particle on critical areas, third-party witness, EN 10204 3.2 certificates with an inspector present — each adds cost that is invisible on a per-kg figure. If your drawing requires them, expect them priced. If your drawing does not, do not pay for them by default; standard heat-level testing covers most general engineering work.
Six items turn "about X dollars per kg" into a quotable package:
With those, we return casting and machining as separate lines, the tooling treatment spelled out, and the validity period on the quote — because metal indexes move, and a quote without a validity date is an argument scheduled for later. Our standard quotation runs FOB Qingdao with a stated validity period, and the price holds unless the material index moves materially.
Why did the price go up since last year's order?
Melt inputs — pig iron, scrap, ferroalloys — are indexed commodities. A quote has a validity date for exactly this reason. Everything else in the quote should hold unless the drawing changed.
Is a cheaper per-kg quote always riskier?
Not always, but it deserves scope checking. The most common gap is testing and certificates, the second is machining allowances. Ask what is excluded, in writing.
Do I pay for the risers and gates?
They are part of the process yield, and competitive quotes absorb them into the piece price. If a supplier quotes "net finished weight only" at an impossibly low rate, the metal is coming from somewhere — usually the defect rate.
What volume makes casting competitive against fabricating a weldment?
It depends on machining share and part complexity, but the crossover for ductile iron parts usually arrives in the thousands of pieces, where setup amortization and casting's geometry freedom both pay off. Below that, a weldment is often the honest answer.
Can you hold the price for the life of the project?
Within the quote's validity period, yes. Beyond it, the melt index clause applies. We would rather re-quote transparently than pad the first price to cover unknown movement.
Why do you show casting and machining separately?
So you can negotiate each against real alternatives — a different machining scope changes the comparison completely, while the casting cost barely moves.
The six items above, plus one more: tell us which price components matter to you — unit price, tooling, or lead time — so the quote optimizes for what you actually buy. A quote built on the wrong priority is accurate and useless at the same time.
Related reading: sand casting tooling cost and pattern life, how to audit a casting supplier before the first order, our castings and capacity, and ductile iron casting properties.